For Africa water & infrastructure projects
CFCONFLEXBuilt for connection
Products / Dismantling Joints / Steel Dismantling Joint VSSJA C2F

Dismantling Joints

Steel Dismantling Joint VSSJA C2F

A double-flanged fabricated steel C2F dismantling joint for adjustable equipment connections in engineered pipe systems.

Blue steel VSSJA C2F double flanged dismantling joint
Current catalogue reference image

Product overview

Steel Dismantling Joint VSSJA C2F

The VSSJA C2F provides a steel double-flanged arrangement for projects that need installation adjustment and a removable flanged section. Because fabricated variants can differ by schedule, the approved dimensional drawing is the primary selection document.

Double-flanged steel configuration for project-specific layouts.

Water transmission mainsPumping stationsIndustrial water systems
Back to Dismantling Joints

Technical reference

Technical basis for Steel Dismantling Joint VSSJA C2F

Made to the confirmed project size and installation envelope. Pressure and temperature are confirmed for the ordered configuration. Use these points to identify the right drawing—not as a universal rating for every configuration.

Connection
C2F double-flanged adjustable assembly with tie rods
Material basis
Fabricated steel body with project-selected coating, gasket and fasteners
Reference range
Made to the confirmed project size and installation envelope
Pressure / duty
Pressure and temperature are confirmed for the ordered configuration

Selection focus

Four checks for this VSSJA C2F steel dismantling joint

  1. 1Identify the exact C2F configuration required by the project specification.
  2. 2Send DN, flange drilling, working pressure and face-to-face gap.
  3. 3Define the medium, temperature and internal/external coating requirement.
  4. 4Confirm thrust loads and tie-rod details with the piping engineer.

Installation notes for Steel Dismantling Joint VSSJA C2F

  • Check flange alignment before tightening; do not draw misaligned pipework into place.
  • Keep the telescopic section within the marked installation range.
  • Pressure-test under the project method statement before service.
Read the general installation guide

Choosing Steel Dismantling Joint VSSJA C2F

Use the C2F page as the starting point when that configuration is named in the piping specification. Compare B2F where the project detail shows a different restraint arrangement, and compare the DI version where cast construction is preferred.

Compare all dismantling joints

Frequently asked questions

Steel Dismantling Joint VSSJA C2F FAQ

What distinguishes the VSSJA C2F dismantling joint in a pipeline layout?

C2F is a fabricated steel, double-flanged adjustable assembly with tie rods. It is suited to removable flanged sections where the project specification and approved drawing define the exact connection geometry.

How is the installation length for a C2F joint confirmed?

Send the available gap, connected equipment dimensions and flange details. The quotation drawing should state the ordered face-to-face length and permitted adjustment, which installers must verify before tightening.

What must be checked before pressure-testing a C2F assembly?

Confirm flange alignment, gasket seating, tie-rod position, bolt tightening and the final telescopic setting. The line should be supported and tested under the project method statement rather than loaded through the adjustable section.

Ready for technical review?

Request a project-matched Steel Dismantling Joint VSSJA C2F quotation.

Request a Quote